Re: RRB

$
0
0

Hi,

 

This is not possible in Standard SD

Even if you create three materials for

1. stand by

2. Operational

3. Maintenance

 

you cannot differentiate these three technically in the sales order

If you are using DIP, then you can have three activity types for each and can maintain the cost as

stand by =o Hr

operation = 2 Hr

maintenance = 2 Hr

so total cost will be captured for  4 Hrs and it will be captured using DIP

 

regards,

santosh